Thank you for your patience. Some pages may be slower than usual while we make improvements behind the scenes.

Tuesday 21 July 2026
Beta
The Daily Central Coast

Central Coast Local News · Every Day

policy

Central Coast Local Environmental Plan 2022 sets height and lot rules for development applications

Residents preparing development applications on the Central Coast must follow building height limits, minimum lot sizes and documentation requirements under the 2022 plan.

By Central Coast Policy Desk · Published 20 July 2026

How we reported this

Produced with AI assistance and reviewed against our editorial and accuracy standards. Spotted an error or need a correction? Contact us.

Central Coast Local Environmental Plan 2022 sets height and lot rules for development applications
Photo: Laurent ERRERA from L'Union, France / Wikimedia Commons (CC BY-SA 2.0)

The Central Coast Local Environmental Plan 2022 establishes the primary zoning and development rules across the region. It consolidated the former Gosford and Wyong LEPs into a single instrument that now applies to most new proposals.

This plan took effect in 2022 and continues to shape decisions on residential projects. Residents considering subdivision, dual occupancies or new dwellings encounter its standards at the point they lodge a development application with Central Coast Council.

Standards that apply to most sites

Under the plan a default maximum building height of 10 metres applies to dwellings in areas not specifically mapped. This limit generally restricts buildings to two storeys. The minimum lot size for residential subdivision where not mapped is 450 square metres. In R2 Low Density Residential zones dual occupancies typically require lots between 450 and 600 square metres.

Each zone contains a land use table that classifies development as permitted without consent, permitted with consent or prohibited. Projects permitted with consent require a full development application, while those permitted without consent need only a construction certificate.

Documentation required for approval

A Statement of Environmental Effects must accompany most development applications. This document demonstrates how the proposal complies with both the Central Coast Local Environmental Plan 2022 and the Central Coast Development Control Plan 2022. Applicants check the relevant land use table early to determine whether consent is needed.

Residents feel the impact of these rules when they prepare or assess a proposal for their property. The requirements determine what can be built, the size of any new lots and the information that must be submitted before work can begin.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Central Coast is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS